Loan Program Data
General Program Statistics
- Current Outstanding Loans
- $73,208,130
- $73,208,130
- Number of Currently Active Loans
- 40
- 40
- Current Average Loan Term
- 16
- 16
- Total Principal Loaned
- $127,234,800*
- $127,234,800*
- Number of Loans to Date
- 180
- 180
- Average Loan Amount
- $706,860
* denotes estimated values
Updated 2/2023
Aging Infrastructure Grants Data
Round 1 Funding
20 Project Applications Received
12 Projects Funded
- Total Grant Funding Requested
- $41,746,786
- Total Application Project Costs
- $139,131,768
- Aging Infrastructure Grant Funding Limit
- $12,500,000
- Bannock Feeder; Diversion Replacement
- Funds Awarded – $250,000
- Total Project Costs – $885,110
- Big Lost; Dam Repair
- Funds Awarded – $2,000,000
- Total Project Costs – $9,082,856
- Boise Project Board of Control – New York Canal Lining
- Funds Awarded – $2,418,900
- Total Project Costs – $7,330,000
- Chester Canal & Irrigation Company; Diversion Headgate
- Funds Awarded – $29,725
- Total Project Costs – $129,238
- Dalton Gardens Irrigation District; Delivery Improvements
- Funds Awarded – $23,460
- Total Project Costs – $69,000
- Enterprize Canal Company; Converting Canal to Pipeline
- Funds Awarded – $2,736,227
- Total Project Costs – $8,291,597
- Falls Irrigation District; Pump Station Rehab
- Funds Awarded – $200,588
- Total Project Costs – $9,095,000
- Fremont Madison Irrigation District; Upgrades to Diversion Structures
- Funds Awarded – $58,200
- Total Project Costs – $232,874
- King Hill Irrigation District; Pump Station & Closed Conduit
- Funds Awarded – $1,980,259
- Total Project Costs – $6,154,187
- Nampa-Meridian Irrigation District; Ridenbaugh Canal Modernization
- Funds Awarded – $1,820,048
- Total Project Costs – $9,637,000
- North Side Pumping Company #2; pump station/canal abandonment
- Funds Awarded – $951,800
- Total Project Costs – $4,138,388
- Water District 63; Monitoring System Upgrades
- Funds Awarded – $30,793
- Total Project Costs – $133,883
Round 2 Funding
36 Project Applications Received
18 Projects Funded
- Total Grant Funding Requested
- $28,086,632
- Total Application Project Costs
- $148,060,754
- Aging Infrastructure Grant Funding Limit
- $12,500,000
- WRV Board of Control – diversion 45 rehab
- Funds Awarded – $309,000
- Total Project Costs – $1,030,024
- Falls Irrigation District – pump station rehab
- Funds Awarded – $2,000,000
- Total Project Costs – $9,095,000
- Cub River Irrigation Company – pump station project
- Funds Awarded – $1,000,000
- Total Project Costs – $5,951,000
- Nampa Meridian Irrigation District – modernize canal diversion
- Funds Awarded – $1,866,116
- Total Project Costs – $13,388,370
- Curran Ditch Users Association – pipeline project
- Funds Awarded – $16,100
- Total Project Costs – $70,000
- HFF Conant Creek – canal lining & automation
- Funds Awarded – $499,145
- Total Project Costs – $2,172,444
- Island Ward Canal Co – replace main diversion headgate & automation
- Funds Awarded – $11,945
- Total Project Costs – $47,781
- Northside Canal Co – canal lining
- Funds Awarded – $2,000,000
- Total Project Costs – $7,342,600
- King Hill Irrigation District – cold springs pipe project
- Funds Awarded – $828,501
- Total Project Costs – $2,773,364
- Twin Falls Canal Co – canal lining (Highline)
- Funds Awarded – $245,547
- Total Project Costs – $818,490
- Big Lost Irrigation District – canal lining
- Funds Awarded – $900,000
- Total Project Costs – $3,100,000
- Boise City Canal Co – Headgate modernization
- Funds Awarded – $122,000
- Total Project Costs – $366,000
- Hat Butte Mutual Canal Co – pipeline project
- Funds Awarded – $78,965
- Total Project Costs – $282,025
- Solenberger Ditch Co – headgate replace and relocation
- Funds Awarded – $3,000
- Total Project Costs – $9,000
- Sunnydell Irrigation District – diversion structure modernization
- Funds Awarded – $30,233
- Total Project Costs – $107,940
- Twin Falls Canal Co – measure box improvements (Rubicon)
- Funds Awarded – $44,037
- Total Project Costs – $146,791
- Burley Irrigation District – replace f waste structure
- Funds Awarded – $891,000
- Total Project Costs – $2,700,000
- Hayden Lake Irrigation District – replace and relocate main pipeline
- Funds Awarded – $1,654,411
- Total Project Costs – $6,180,000
Round 3 Funding
23 Project Applications Received
22 Projects Funded
- Total Grant Funding Requested
- $11,177,689
- Total Application Project Costs
- $42,932,118
- Aging Infrastructure Grant Funding
- $11,177,689
- Blaine County Canal Company – Pipeline Conversion
- Funds Awarded – $1,314,786
- Total Project Costs – $5,716,461
- Burgess Canal & Irrigating Company – Main & Boondock Diversion
- Funds Awarded – $1,057,584
- Total Project Costs – $3,204,800
- Burnett Water Users Assn. – Pipeline Conversion
- Funds Awarded – $825,000
- Total Project Costs – $2,500,000
- Egin Bench Canals Inc. – Main Diversion
- Funds Awarded – $31,349
- Total Project Costs – $125,396
- Elmore County – Seepage Study
- Funds Awarded – $5,445
- Total Project Costs – $16,500
- Falls Irrigation Dist. – Pump Station Rehab
- Funds Awarded – $831,079
- Total Project Costs – $9,095,000
- Fremont Madison Irrigation Dist. – Grassy Lake Reservoir Outlet Gate
- Funds Awarded – $16,575
- Total Project Costs – $61,388
- Grindstone Butte Mutual – Canal Lining
- Funds Awarded – $1,555,167
- Total Project Costs – $4,665,501
- Island Ward Canal Co. – Headgate Replacement
- Funds Awarded – $2,457
- Total Project Costs – $7,370
- Long Island Irrig. Co. – Headgate Replacement & Automation
- Funds Awarded – $74,222
- Total Project Costs – $224,915
- Marysville Irrig. Co. – Canal Lining
- Funds Awarded – $42,964
- Total Project Costs – $186,800
- Mill Canyon North Canal Co. – Line Improvements & Conservation
- Funds Awarded – $11,496
- Total Project Costs – $34,839
- Milner Dam Inc – Emergency Spillway Bridge Deck
- Funds Awarded – $555,423
- Total Project Costs – $1,851,408
- Milner Dam Inc – Service Spillway Concrete Project
- Funds Awarded – $12,200
- Total Project Costs – $40,667
- Milner Dam Inc – Service Spillway Plunge Pool
- Funds Awarded – $1,521,000
- Total Project Costs – $5,070,000
- Mountain Home Irrigation District – Tunnel Repair
- Funds Awarded – $132,412
- Total Project Costs – $401,250
- Payette Lakes Recreational Water & Sewer District – Liner Replacement – Storage Re-Use Pond
- Funds Awarded – $1,803,318
- Total Project Costs – $5,464,600
- Portneuf Marsh Valley Canal Company – Chesterfield Reservoir
- Funds Awarded – $625,000
- Total Project Costs – $1,880,000
- Twin Falls Canal Co – Rubicon SlipMeter Installation
- Funds Awarded – $20,458
- Total Project Costs – $68,191
- United Canal Company – Southtown Check & Diversion Replacement Project
- Funds Awarded – $70,000
- Total Project Costs – $298,000
- Weiser River Soil Conservation District – Galloway Dam Repair and Resurface
- Funds Awarded – $124,410
- Total Project Costs – $383,000
- West Indian Cove Water Company Inc – Pumping Station & Closed Conduit System
- Funds Awarded – $545,344
- Total Project Costs – $1,636,032
Round 4 Funding
20 Project Applications Received
19 Projects Funded
- Total Grant Funding Requested
- $7,711,350
- Total Application Project Costs
- $25,082,811
- Aging Infrastructure Grant Funding
- $7,678,350
- Aberdeen-American Falls Res. Dist. 2 – Radial Gate Repair
- Funds Awarded – $40,000
- Total Project Costs – $135,051
- Bilbrey Ditch Company – Canal Automation
- Funds Awarded – $40,173
- Total Project Costs – $121,735
- Black Canyon Irrigation District – Main Canal Metering Project
- Funds Awarded – $100,000
- Total Project Costs – $463,397
- Capital View Irrigation District – Pipe replacement and upgrade
- Funds Awarded – $59,550
- Total Project Costs – $198,500
- Dalton Gardens Irrigation District – Transmission Line, Manifold and Pump House Rehab Project
- Funds Awarded – $1369,165
- Total Project Costs – $4,107,500
- Farmers Land & Irrigation Company – Diversion Replacement Project
- Funds Awarded – $89,667
- Total Project Costs – $269,000
- Fremont Madison Irrigation District – Crosscut Canal Automation and Repair
- Funds Awarded – $26,680
- Total Project Costs – $80,850
- Jefferson Irrigation Company – Measurement Modernization
- Funds Awarded – $145,648
- Total Project Costs – $458,800
- Jefferson Irrigation Company – Conversion to Pipe
- Funds Awarded – $581,488
- Total Project Costs – $2,528,210
- Last Chance Canal Company – Water Measurement
- Funds Awarded – $140,674
- Total Project Costs – $211,000
- Moore Canal Water User’ Association – Pipeline Conversion
- Funds Awarded – $1,024,819
- Total Project Costs – $3,202,559
- Mountain Home Irrigation District – Irrigation Tunnel Repair
- Funds Awarded – $394,403
- Total Project Costs – $1,195,161
- Mud Lake Water Users – Sparks Pump Station, Laterals 1 & 6
- Funds Awarded – $800,000
- Total Project Costs – $2,400,000
- New Sweden Irrigation District – Martin Flume Relocation
- Funds Awarded – $672,891
- Total Project Costs – $2,039,062
- Parks and Lewisville Irrigation Company – Headgate Replacement & Automation
- Funds Awarded – $83,852
- Total Project Costs – $254,098
- Sunnydell Irrigation District – Canal Lining
- Funds Awarded – $2,000,000
- Total Project Costs – $6,971,002
- Teton Irrigation – Pipeline Conversion
- Funds Awarded – $58,008
- Total Project Costs – $175,780
- Twin Falls Canal Company – Closer Highline Measurement
- Funds Awarded – $51,332
- Total Project Costs – $171,106
Flood Management Grants Data Summary
2018
18 Project Applications Received
14 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $1,000,000
2019
12 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $870,000
2020
14 Project Applications Received
12 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $870,000
2021
12 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $1,043,000
2022
12 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $1,043,000
2023 – TBD
14 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding
- $947,627
2024 – TBD
2025 – TBD
Flood Management Grants Data
2018 Flood Management Grant Awards
18 Project Applications Received
14 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $1,000,000
- Flood Control District 9
- Funds Awarded – $90,000
- Total Project Costs – $191,604
- Blaine County
- Funds Awarded – $121,331
- Total Project Costs – $306,334
- Cassia County
- Funds Awarded – $42,336
- Total Project Costs – $84,672.75
- Flood Control District 10 – New Dry Creek
- Funds Awarded – $78,400
- Total Project Costs – $156,800
- Flood Control District 10 – Duck Alley Pit Capture
- Funds Awarded – $153,550
- Total Project Costs – $307,100
- Flood Control District 10 – Porter & Mulchay
- Funds Awarded – $38,808
- Total Project Costs – $77,616
- Clearwater Soil & Water Conservation District
- Funds Awarded – $155,220
- Total Project Costs – $310,436
- Flood Control District 10 – Leighton & Wells
- Funds Awarded – $22,000
- Total Project Costs – $44,000
- Flood Control District 11
- Funds Awarded – $57,675
- Total Project Costs – $115,350
- Twin Lakes Rathdrum Creek Flood Control District 17
- Funds Awarded – $7,750
- Total Project Costs – $21,440
- Twin Falls Canal Company
- Funds Awarded – $85,340
- Total Project Costs – $591,800
- Nez Perce Soil & Water Conservation District (In Progress)
- Funds Awarded – $115,460
- Total Project Costs – $556,681
- Riverside Village HOA
- Funds Awarded – $6,025
- Total Project Costs – $16,000
- City of Pocatello
- Funds Awarded – $26,105
- Total Project Costs – $66,128.82
2019 Flood Management Grant Awards
12 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $870,000
- City of Boise
- Funds Awarded – $6,371
- Total Project Costs – $21,236
- Blaine County – Big Wood Hospital Bridge
- Funds Awarded – $50,000
- Total Project Costs – $432,454
- Blaine County – Broadford Road Fisherman’s Access
- Funds Awarded – $100,000
- Total Project Costs – $263,498
- Flood Control District 10
- Funds Awarded – $160,000
- Total Project Costs – $527,000
- City of Hailey
- Funds Awarded – $50,000
- Total Project Costs – $104,134
- Board of Control Irrigation District 45
- Funds Awarded – $59,050
- Total Project Costs – $136,457
- Clearwater Soil & Water Conservation District – Gold Creek
- Funds Awarded – $72,727.39
- Total Project Costs – $160,896.09
- Clearwater Soil & Water Conservation District – Shanghai Creek
- Funds Awarded – $190,492.37
- Total Project Costs – $392,561,10
- Idaho Soil & Water Conservation District – Deer Creek
- Funds Awarded – $159,436
- Total Project Costs – $171,088
- Idaho Soil & Water Conservation District – Lower Three Mile Creek
- Funds Awarded – $21,619.50
- Total Project Costs – $42,273.50
2020 Flood Management Grant Awards
14 Project Applications Received
12 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $870,000
- Lewis Soil Conservation District – Alpine Road
- Funds Awarded – $18,425.30
- Total Project Costs – $46,709.30
- Clearwater Soil & Water Conservation District – Louse Creek
- Funds Awarded – $24,687
- Total Project Costs – $58,028
- City of Bellevue – Lower Howard Preserve
- Funds Awarded – $57,880
- Total Project Costs – $120,980
- Twin Falls Canal Co. & City of Twin Falls
- Funds Awarded – $51,000
- Total Project Costs – $101,924
- Flood Control District No.10 – Boise River North Channel
- Funds Awarded – $47,500
- Total Project Costs – $95,000
- Flood Control District No.10 – Boise River Canyon Reach 1
- Funds Awarded – $175,000
- Total Project Costs – $350,000
- City of Orofino – Orofino Creek
- Funds Awarded – $200,000
- Total Project Costs – $1,221,640
- Idaho Soil & Water Cons. Dist. – Lower Cottonwood Creek
- Funds Awarded – $27,935.20
- Total Project Costs – $55,890.20
- Idaho Soil & Water Cons. Dist. – Sill Creek
- Funds Awarded – $10,960.28
- Total Project Costs – $22,069.28
- Idaho Soil & Water Cons. Dist. – Clear Creek
- Funds Awarded – $18,570.60
- Total Project Costs – $37,157.60
- Raft River Flood Control Dist. No.15
- Funds Awarded – $80,525
- Total Project Costs – $161,050
- Pioneer Irrigation District – Mason Creek
- Funds Awarded – $148,500
- Total Project Costs – $297,000
2021 Flood Management Grant Awards
12 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $1,043,000
- North Side Canal Company – Red Bridge Flood Management Storage Pond
- Funds Awarded – $200,000
- Total Project Costs – $864,000
- Flood District 9 – Bellevue Side Channel Project
- Funds Awarded – $111,508
- Total Project Costs – $284,033
- Nez Perce County & NPSWCD – Streambank Project
- Funds Awarded – $100,000
- Total Project Costs – $227,176
- Flood District 17 – Rathdrum Creek Debris Project
- Funds Awarded – $6,375
- Total Project Costs – $12,750
- Adams Soil & Water Conservation District – Grays Creek Project
- Funds Awarded – $17,606
- Total Project Costs – $35,728
- Clearwater Soil & Water Conservation District – Heywood Bridge
- Funds Awarded – $37,475
- Total Project Costs – $75,117
- Clearwater Soil & Water Conservation District – Swanson’s Loop
- Funds Awarded – $200,000
- Total Project Costs – $409,487
- Reid Canal Company – Bannock Feeder Project
- Funds Awarded – $200,000
- Total Project Costs – $429,266.29
- Lewis Soil & Water Conservation District – Tiede Road Flood Project
- Funds Awarded – $71,910
- Total Project Costs – $144,118.60
- Idaho Soil & Water Conservation District – Clear Creek Project
- Funds Awarded – $36,062
- Total Project Costs – $73,904.60
2022 Flood Management Grants
12 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding Limit
- $1,043,000
- Goose Creek Flood Project
- Funds Awarded – $200,000
- Total Project Costs – $535,536
- City of Lewiston Flood Project
- Funds Awarded – $106,352
- Total Project Costs – $212,705
- Madison County Flood Control Diversion Project
- Funds Awarded – $126,392
- Total Project Costs – $252,784
- Boise River FCD 10 Flood Maintenance Project
- Funds Awarded – $125,000
- Total Project Costs – $250,000
- Madison County Teton River Splitter Gate Project
- Funds Awarded – $47,859
- Total Project Costs – $95,717
- Twin Lakes FCD 17 Debris Removal Project
- Funds Awarded – $8,000
- Total Project Costs – $16,000
- Squaw Creek Ditch Company Flood Project
- Funds Awarded – $125,000
- Total Project Costs – $250,000
- Riverside Water & Sewer District Project
- Funds Awarded – $200,000
- Total Project Costs – $440,388
- ESPAR & Madison County Flood Diversion Project
- Funds Awarded – $47,300
- Total Project Costs – $99,600
- Clearwater SWCD Garden Creek Project
- Funds Awarded – $84,085
- Total Project Costs – $176,458
2023 Flood Management Grants
14 Project Applications Received
10 Projects Funded
- Grant Funding Limit (Per Project)
- $200,000
- Flood Management Grant Funding
- $947,627
- City of Victor – Calderwood Bridge Erosion Plan
- Funds Awarded – $27,500
- Total Project Costs – $55,000
- Clearwater Soil & Water Conservation District – Jim Ford Creek Crossing
- Funds Awarded – $81,063
- Total Project Costs – $163,308
- Eagle Sewer And Water District – Eagle Sewer Flood Mitigation Project
- Funds Awarded – $200,000
- Total Project Costs – $1,913,580
- Flood Control District No. 9 – Heagle Park Floodplain Restoration
- Funds Awarded – $118,086
- Total Project Costs – $296,586
- Hiawatha Canal Users Association – Big Wood River Flood Mitigation
- Funds Awarded – $200,000
- Total Project Costs – $696,497
- Joint School District No. 171 – Orofino JSD 171 Flood Mitigation
- Funds Awarded – $89,064
- Total Project Costs – $178,128
- Oakley Highway District – Cassia County Bridge Replacement
- Funds Awarded – $176,000
- Total Project Costs – $351,090
- Twin Falls Canal Co. & City of Twin Falls – Pipe Replacement & Diversion Reconstruction
- Funds Awarded – $5,914
- Total Project Costs – $317,946